Friday, October 14, 2016

Installing Galley Base and Quarter Panels

 Four stiffeners have been glued to the galley base and the galley base installed in the back of the camper.  The bricks and cans are acting as weights while all the glue sets.  (Remember, the camper is still upside-down.)

Here's the galley base installed, along with the quarter panels on each side.  The blue lines are masking tape applied to the part of the shell that will become the galley hatch--just to make sure nothing gets glued to it. 

The small object in the lower-left corner of the photo is a thermometer.  I have a fairly wide window of temperatures to work in (60 - 90 deg F), but it's starting to get close to the lower limit at night so I'm keeping close track.  This particular thermometer records the lowest and highest readings over the previous 24 hours.

No comments:

Post a Comment